Starting the erection of the North Shore cantilever arm, showing the supporting platform in place carrying the first sections of the lower chord.
Series — Box: 0117.01, Folder: 27.01
Scope and Contents
Starting the erection of the North Shore cantilever arm, showing the supporting platform in place carrying the first sections of the lower chord. 264 – June 18-15 (photo shows massive steel girders and beams supported on a masonry pier, water and low hills in background)
Dates
- Creation: 1900 - 1982
Creator
- From the Collection: Eney, William J. (Person)
- From the Collection: Worthington, William E. (Person)
Extent
From the Collection: 0.4 Linear Feet
Language of Materials
From the Collection: English
Repository Details
Part of the Lehigh University Special Collections Repository
Contact:
Lehigh University
Linderman Library
30 Library Drive
Bethlehem PA 18045 USA
610-758-4506
610-758-6091 (Fax)
inspc@lehigh.edu
Lehigh University
Linderman Library
30 Library Drive
Bethlehem PA 18045 USA
610-758-4506
610-758-6091 (Fax)
inspc@lehigh.edu