January 1962 - June 1962

 Sub-Series — Box: 0334.02
Scope and Contents From the Collection:

The collection of material has been divided among three archival boxes and within each box are folders containing material categorized chronologically. The maps, white prints and blueprints have been sorted by Project number and filed in three large folders placed in map drawers.

Dates: 1943-1962

January 5 – January 12 Development PA-11-5 Bartholomew to Thomas A. Carr, 1962

 File — Box: 0334.02, Folder: 01, Item: 01
Scope and Contents

Jan. 5 weekly Construction Report Nos. 222 – 228 Jan. 9 Periodical Estimates for three contractors: Altemus, Lehigh Valley Pipe Fabricating Co., West Side Electrical Services $30,267.01 Jan. 9 record of conferences 12/29/61 and 1/5/62 Jan. 12 weekly Construction Report Nos. 229 – 235

Dates: 1962

January 15 – February 2 (mostly Bartholomew to Carr), 1962

 File — Box: 0334.02, Folder: 02, Item: 02
Scope and Contents Jan. 15 Construction Report No. 16, 2 copies of Site Plan Diagram Jan. 18 Bartholomew to S. Harman Brown, Architect re: Change Order No. 2 meter house, Hinges and locks on Bilco doors, Change Order E-1 conduits, Speed Queen washers Jan. 19 weekly Construction Report Nos. 236 – 242 Jan. 26 weekly Construction Report Nos. 243 – 249 Jan. 31 Construction Report No. 17 Feb. 1 Bartholomew to Brown re: General Construction Contract, PA-11-5 Change Order Credit Feb. 2 Construction Report Nos. 250 –...
Dates: 1962

February 5 – February 15, 1962

 File — Box: 0334.02, Folder: 03, Item: 03
Scope and Contents

Feb. 5 Bartholomew to Archie P. Burgess (Philadelphia Regional Office) re: Frank V. Loretti, Labor Relations Officer, visit to BHA Feb. 9 Bartholomew to Carr re: Construction Report Nos.27 – 263 Feb. 12 (see previous) progress meeting held 2/9/62 Feb. 15 (see previous) Construction Report No. 18 Feb. 15 Bartholomew to Brown re: meeting with Joseph E. Biro, Engineer, proposed Change Order for gas meter house (2 page letter)

Dates: 1962

February 16 – February 19, 1962

 File — Box: 0334.02, Folder: 04, Item: 04
Scope and Contents

Feb. 16 Bartholomew to Carr weekly Construction Report Nos. 264 – 270 Feb. 19 Record of meeting held in BHA Central Office (14 items listed) Feb. 19 Bartholomew to Carr Periodical Estimates for contractors: Altemus, Scattene, West Side Electrical Service $18,298.87

Dates: 1962

February 21 - March 2, 1962

 File — Box: 0334.02, Folder: 05, Item: 05
Scope and Contents

Feb. 21 Bartholomew to Brown re: T. V. service agreement Feb. 23 Bartholomew to Carr weekly Construction Report Nos. 271 – 277 Feb. 26 Bartholomew to Brown re: Boiler House Extension with Re-location of U.G.I. Facilities for PA-11-2 & 5 Feb. 26 Bartholomew to Raymond H. Snyder (City of Bethlehem) re: property lines, Parkridge Homes, PA-11-4 Mar. 1 Bartholomew to Carr Construction Report No. 19 Mar. 2 (see previous) weekly Construction Report Nos. 278 – 284

Dates: 1962

March 7 – March 19, 1962

 File — Box: 0334.02, Folder: 06, Item: 06
Scope and Contents Mar. 7 Bartholomew to C.B.L. Television Services (Bark Lee Chin) re: T.V. Antenna Service – The Robert Pfeifle Homes, PA-11-5 Mar. 8 Bartholomew to Milton B. Riskin re: T.V. Antenna Service – The Robert Pfeifle Homes Mar. 8 Record of Meeting Held on the site of Robert Pfeifle Homes, PA-11-5 Mar. 9 Bartholomew to Carr weekly Construction Report Nos. 285 – 291 Mar. 9 Bartholomew to Charles R. Schiffner re: audit by the Labor Relations Division of Public Housing Administration – employment of...
Dates: 1962

March 15 to March 23, 1962

 File — Box: 0334.02, Folder: 07, Item: 07
Scope and Contents

Mar. 15 Thomas A. Carr to Ralph J. Bartholomew re: report from Howard S. Derrow about serious cracks in plastered ceilings of Project PA-11-5 Mar. 21 Bartholomew to Security Aluminum Window Manufacturing Corp. re: order dated February 15, 1962 received but some items missing or broken Mar. 23 Bartholomew to Carr re: weekly Construction Report Nos. 299 - 305

Dates: 1962

March 27 to March 30, 1962

 File — Box: 0334.02, Folder: 08, Item: 08
Scope and Contents

Mar. 27 Bartholomew to Archie P. Burgess re: Gas Meter House, Boiler House, Aluminum doors, gas ranges, electric refrigerators (2 pages) Mar. 29 (see previous) re: Fabric Doors (folding partitions) Mar. 30 Bartholomew to Carr re: weekly Construction Report Nos. 306 - 312

Dates: 1962

April 2 - April 12, 1962

 File — Box: 0334.02, Folder: 09, Item: 09
Scope and Contents Apr. 2 Bartholomew to Carr re: plaster damage Apr. 5 Bartholomew to Charles R. Altemus re: Memo landscape work for Dover Lane subcontractor Apr. 6 Bartholomew to Carr re: weekly Construction Report Nos. 313 - 319 Apr. 12 (see previous) re: latest Periodical Estimates for Altemus, Scattene, Lehigh Valley Pipe Fab. Co., West Side Electrical Service 0334.02.10 April 13 to April 23 Apr. 13 Bartholomew to Carr re: weekly Construction Report Nos. 320 - 326 Apr. 13 (see previous) re: Sub-Contractor...
Dates: 1962