Skip to main content

I-81 Fire Damaged Steel Bridge Girder (1994): Fisher consulted on bridge repair, includes correspondence, technical drawings and photos (6 count)

 File — Multiple Containers

Dates

  • Creation: Inclusive Dates

Extent

From the Collection: 102.0 Linear Feet (204 boxes, 102 linear feet)

Language of Materials

From the Collection: English

Repository Details

Part of the Lehigh University Grant Projects Repository

Contact:
Linderman Library
30 Library Drive
Bethlehem PA 18015 USA
610-758-4506
610-758-6091 (Fax)