Box 23
Container
Contains 20 Results:
Rail Failure (1998, AMTRAK): Crack caused by welding arc strike enlarged by fatigue loading
File — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Includes exchanged emails as well as notes and preliminary analysis
Item — Multiple Containers
Dates:
Inclusive Dates
Report: In-Service Stresses in 132 TW Miter Rails at Train Speeds up to 90 mph at AMTRAK’s Portal Swing Bridge: PDF Available at: ; HYPERLINK "http://preserve.lehigh.edu/engr-civil-environmental-atlss-reports/3/" \h ;http://preserve.lehigh.edu/engr-civil-environmental-atlss-reports/3/
Item — Multiple Containers
Dates:
Inclusive Dates
Guidebook for Inspection, Maintenance and New Construction of Mitre Rail Expansion Joint Systems on Movable Bridges
Item — Multiple Containers
Dates:
Inclusive Dates
Comments and Recommendations on the Guidebook for Inspection, Maintenance and New Construction of Mitre Rail and Expansion Joint Systems on Movable Bridges
Item — Multiple Containers
Dates:
Inclusive Dates
Study of Turnouts, Northeast Corridor (1997, AMTRAK/Conrail)
File — Multiple Containers
Dates:
Inclusive Dates
Norfolk Southern: System Map as well as letter detailed the acquisition of 58% of Conrail
Item — Multiple Containers
Dates:
Inclusive Dates