Box 27
Container
Contains 18 Results:
Wolf Creek (1982-1985, Bechtel Power and Utilities): Anchor stud failure examination
File — Multiple Containers
Dates:
Inclusive Dates
Presentation Slides: Includes graphical representations of test results
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Detailed conversation between parties discussing procedures
Item — Multiple Containers
Dates:
Inclusive Dates
Final Report: Results of Tests on Anchor Studs from Wolf Creek Embed Plates
Item — Multiple Containers
Dates:
Inclusive Dates
Diablo Canyon (1983-1984(1), Bechtel): Failure modes of three bolt groups
File — Multiple Containers
Dates:
Inclusive Dates