Box 58
Container
Contains 23 Results:
Brunswick Steam Electric Plant: Assessment of the Miscellaneous Steel Verification Program by the Technical Advisory Committee
Item — Multiple Containers
Dates:
Inclusive Dates
Distribution of Engineering Walkdown Procedure (WDP)
Item — Multiple Containers
Dates:
Inclusive Dates
Final Report on Brunswick Miscellaneous Steel Verification Program (MSVP)
Item — Multiple Containers
Dates:
Inclusive Dates
Reference Material: Includes Bolted Joints with Oversize or Slotted Holes, and Demand and Supply of Ductility in Steel Shear Connections
Item — Multiple Containers
Dates:
Inclusive Dates
Fatigue Problems with Bridges and Other Structures
Item — Multiple Containers
Dates:
Inclusive Dates
Bolted Connection at Counter Stool (1983, Punta Gorde, FL)
File — Multiple Containers
Dates:
Inclusive Dates