Box 66
Container
Contains 15 Results:
Design Concept for the Replacement of the Williamsburg Bridge (Cable Stayed Bridge): Acer Freeman Fox Ltd. in association with Morrison-Knudsen Engineers, Inc.
Item — Multiple Containers
Dates:
Inclusive Dates
Plates II (Cable Stayed Bridge): The Swiss American Team
Item — Multiple Containers
Dates:
Inclusive Dates