Box 68
Container
Contains 7 Results:
Design Concepts for the Replacement of the Williamsburg Bridge over the East River (Cable Stayed Bridge): Kirti A. Gandhi
Item — Multiple Containers
Dates:
Inclusive Dates
Design Concept Williamsburg Bridge (Cable Stayed Bridge): DCR Consultants, Inc.
Item — Multiple Containers
Dates:
Inclusive Dates
Williamsburg Bridge Replacement (Cable Stayed Bridge): Andrews Clark and Associates
Item — Multiple Containers
Dates:
Inclusive Dates
Design Concept for the Replacement of the Williamsburg Bridge (Cable Stayed Bridge): Acer Freeman Fox Ltd. in association with Morrison-Knudsen Engineers, Inc.
Item — Multiple Containers
Dates:
Inclusive Dates
Report I (Cable Stayed Bridge): The Swiss American Team
Item — Multiple Containers
Dates:
Inclusive Dates