Box 80
Container
Contains 20 Results:
Pavlo: Mississippi River Bridge (Gramercy, LA 1984): Review of the design of welding detail for new river bridge
File — Multiple Containers
Dates:
Inclusive Dates
In Depth Hinge Inspection of PennDOT Bridges (I-80, 1984): Hanger and pin inspection of bridge detail, includes correspondence, sample photos and labeled images**
File — Multiple Containers
Dates:
Inclusive Dates
Greiner No. 161: Braga Bridge (MA, 1986): Assessment and replacement design of the floor beam tie plate detail
File — Multiple Containers
Dates:
Inclusive Dates
Notes and Correspondence: Includes labeled report photos and examination summary
Item — Multiple Containers
Dates:
Inclusive Dates
WJE: McCormick Place Bolt Failure ( 1986-1987): Cold cracking in 1 inch bolts results in fatigue crack extension, and later, failure
File — Multiple Containers
Dates:
Inclusive Dates
Notes and Correspondence: Includes examination of fracture surfaces and photos of samples
Item — Multiple Containers
Dates:
Inclusive Dates