Box 81
Container
Contains 19 Results:
New Kensington Bridge (1983): Testing and examination of eyebars, includes report, correspondence and technical drawings
File — Multiple Containers
Dates:
Inclusive Dates
MA Auburn Bridge (1983): Girders and plate connections heavily damaged by cuts and tears
File — Multiple Containers
Dates:
Inclusive Dates
Quincy Bridge (Dywidag, 1984): Design specifications for welded details, includes corresponding technical drawings
File — Multiple Containers
Dates:
Inclusive Dates
Bethlehem Steel Rail (1985): Evaluation procedures to eliminate rail defects in the medium hardness manganese rail
File — Multiple Containers
Dates:
Inclusive Dates
Steel Liner (Weidlinger Associates, 1985): Examination of Steel Shell Fracture Surfaces from Silo-Type Structures ***
File — Multiple Containers
Dates:
Inclusive Dates
Contract Caster (Combustion Engineering, 1986): Modifications and reinforcement of walking beam for reheat furnace
File — Multiple Containers
Dates:
Inclusive Dates
Idaho Bridge (Sverdrup Parcel, 1986): Design of steel deck-arch alternative
File — Multiple Containers
Dates:
Inclusive Dates
Coal Conveyor Pulley Failures (Consumer Power, 1987): Pulley failures resulting from fatigue cracked bolts
File — Multiple Containers
Dates:
Inclusive Dates