Box 86
Container
Contains 18 Results:
Report on Assessment of Stress Relief Procedures in Westgate Bridge Cantilever Section
Item — Multiple Containers
Dates:
Inclusive Dates
Auckland Harbor Bridge (New Zealand, No.136, 1986): Evaluation of fatigue cracking
File — Multiple Containers
Dates:
Inclusive Dates
Hoan Bridge Failure (No.239, 2000-2002): Failure caused by two/three girder design, in combination with extremely low temperatures and over capacity cyclic loads, resulted in sudden girder cracking and brittle failure
File — Multiple Containers
Dates:
Inclusive Dates
Supplementary Information: Articles, reports, design drawings, and inspections
Item — Multiple Containers
Dates:
Inclusive Dates
Technical Drawings: All drawings labeled with crack locations
Item — Multiple Containers
Dates:
Inclusive Dates