Box 103
Container
Contains 19 Results:
Third Interim Report: Cable Strength and Remaining Life and Corrosion Inhibitors
Item — Multiple Containers
Dates:
Inclusive Dates
History of Loading and Stresses, Live Load Summary, Fatigue Life of Stiffening Truss, Cause of Main Tower Overstress, Study of Catastrophic Failure Scenarios During Load Transfer for Recabling, and Overstressed Stringers on the Manhattan Approach
Item — Multiple Containers
Dates:
Inclusive Dates
Williamsburg Bridge Main Cable Investigation - Phases I II: Inspection, Sampling and Testing
Item — Multiple Containers
Dates:
Inclusive Dates