Box 142
Container
Contains 11 Results:
Ground Terminal Engineering Department Technical Memo (with notes and highlighting) - NRAO 100m GBT - 10/8/1993
Item — Multiple Containers
Dates:
Inclusive Dates
400,000 Fatigue Loading Cycle Claim (with notes) - Contract No. AUI-1059 - 10/13/1995
Item — Multiple Containers
Dates:
Inclusive Dates
Request for Proposals: Design, Manufacture, Erection and Test of 10 Radio Telescope Antennas
Item — Multiple Containers
Dates:
Inclusive Dates
Ground Terminal Engineering Department Technical Memo Draft - NRAO 100m GBT
Item — Multiple Containers
Dates:
Inclusive Dates
Product Design Department Technical Memo (with notes) - NRAO 100m GBT
Item — Multiple Containers
Dates:
Inclusive Dates
Dynamic Load Fatigue Testing of Transverse Groove Weld with Backing Bar
Item — Multiple Containers
Dates:
Inclusive Dates