Testing: View of water basin with tile floor underneath. Spur-Dike Project, Test No. 1, Dec. 4, 1959, 1959
Item — Multiple Containers
Dates:
1959
Testing: View of water basin with tile floor underneath. Spur-Dike Project, Test No. 1, Dec. 4, 1959, 1959
Item — Multiple Containers
Dates:
1959
Testing specimen: engineer working with concrete slab specimen in testing machine; two other engineers working in background, 1960
Item — Multiple Containers
Dates:
1960
Testing specimen: engineer working with concrete or composite specimen, no date
Item — Multiple Containers
Dates:
no date
Testing specimen: engineer working with concrete or composite specimen, 1960
Item — Multiple Containers
Dates:
1960
Slide diagram: graph of local stress on specimens in testing, 1961
Item — Multiple Containers
Dates:
1961
Slide diagram: table of test results on a number of different structures; beams and frames, 1961
Item — Multiple Containers
Dates:
1961
Slide diagram: two graphs of allowable stress design and plastic design, 1961
Item — Multiple Containers
Dates:
1961
Slide diagram: two diagrams labeled pinned and restrained, 1961
Item — Multiple Containers
Dates:
1961
Slide diagram: diagram and bar graph showing different levels of stress in a multi-story frame, 1961