Folder 31.2
Container
Contains 11 Results:
Shear circuit feeding system: shear circuit feeding system, no date
Item — Multiple Containers
Dates:
no date
Steel column test: three men testing steel column; gauges and wiring attached, no date
Item — Multiple Containers
Dates:
no date
Steel Plate Girder-post test: view of perforated steel plate girder in testing apparatus with post-test twisting, no date
Item — Multiple Containers
Dates:
no date
Laboratory: View of 14 men working in Fritz Engineering Laboratory testing various materials; Riehle UTM is visible; broad view, 1960
Item — Multiple Containers
Dates:
1960
Laboratory: View of 17 men working in Fritz Engineering Laboratory testing various materials; Riehle UTM is visible; broad view, 1960
Item — Multiple Containers
Dates:
1960
Laboratory: View of 16 men working in Fritz Engineering Laboratory testing various materials; Riehle UTM is visible; broad view, 1960
Item — Multiple Containers
Dates:
1960
Testing specimen: View of horizontal reinforced concrete column broken in half; labeled 21-B, 1960
Item — Multiple Containers
Dates:
1960
Testing specimen: Broad view of elevated steel beam labeled LB 19, 1960
Item — Multiple Containers
Dates:
1960
Testing specimen: Broad view of bent steel beam elevated on supports; labeled LB 19; man can be seen in the background, 1960
Item — Multiple Containers
Dates:
1960
Testing specimen: Broad view of bent steel beam elevated on supports; labeled LB 19, 1960
Item — Multiple Containers
Dates:
1960