Box 1
Container
Contains 18 Results:
Fraser River Bridge, New Westminster (1975, Mile 118.7, Yale Subdivision): Aim to replace deteriorating timber trestle (with steel equivalent)
Item — Multiple Containers
Dates:
Inclusive Dates
Technical Drawings: Details of floorbeams, diagonals, and posts
Item — Multiple Containers
Dates:
Inclusive Dates
Telephone Calls: Conversation notes between Fisher and R. Sweeney (Feb-June 1975)
Item — Multiple Containers
Dates:
Inclusive Dates
Written Correspondence: Early correspondence detailing bridge history and characteristics as well as possible solutions
Item — Multiple Containers
Dates:
Inclusive Dates
Stresses in Hangers: Design calculations and structural analysis of hangers for each proposed scenario
Item — Multiple Containers
Dates:
Inclusive Dates
Stress Cycles: Graphed stress cycles under various loading conditions, includes reference material Report No. ER-87 “The Effect of Unit Trains on Stress Occurrences”
Item — Multiple Containers
Dates:
Inclusive Dates
Fracture and Fracture Strength: Calculations and analysis of pin plate connections and joints
Item — Multiple Containers
Dates:
Inclusive Dates
Traffic: History of traffic patterns with computed force distributions and design calculations by R. Sweeney
Item — Multiple Containers
Dates:
Inclusive Dates