Folder 1
Container
Contains 822 Results:
Live Load Testing of the Wallis Avenue Bridge (Lehigh University)
Item — Multiple Containers
Dates:
Inclusive Dates
Summary of Defendants Position and Outline of Argument
Item — Multiple Containers
Dates:
Inclusive Dates
Draft Copy of Summary of Defendants Position and Recital of Facts
Item — Multiple Containers
Dates:
Inclusive Dates
Evaluation of Cracks in the East Tie Girder of St. Georges Bridge
Item — Multiple Containers
Dates:
Inclusive Dates
Study of Two Through-Girder Bridges with Floor Beams Encased in Concrete Deck
Item — Multiple Containers
Dates:
Inclusive Dates
Evaluation Report - Phase I: Minimum Content of Submittals
Item — Multiple Containers
Dates:
Inclusive Dates