Folder 1
Container
Contains 822 Results:
Reference Material: Finding Solutions: Steel Moment Frames after Northridge, Why Steel Fractured in the Northridge Earthquake, Lincoln Electric Company Testing Procedures, and Modern Steel Construction Periodical
Item — Multiple Containers
Dates:
Inclusive Dates
Triangle Building (Warner Bros. SKG): Beam-Column Sample Testing
Item — Multiple Containers
Dates:
Inclusive Dates
A Survey of Steel Moment-Resisting Frame Buildings Affected by the 1994 Northridge Earthquake
Item — Multiple Containers
Dates:
Inclusive Dates
Reconnaissance Report on Damage to Steel Building Structures Observed from the 1995 Hyogoken-Nanbu Earthquake
Item — Multiple Containers
Dates:
Inclusive Dates
Modern Steel Construction, ENR: Caught Off Balance, and The Lessons Learned from the Northridge Earthquake
Item — Multiple Containers
Dates:
Inclusive Dates
Interim Guideline No. 1: Steel Moment Frame Connection (FINAL DRAFT)
Item — Multiple Containers
Dates:
Inclusive Dates
Proceedings of AISC Special Task COmmittee on the Northridge Earthquake Meeting
Item — Multiple Containers
Dates:
Inclusive Dates