Folder 1
Container
Contains 822 Results:
CNR Investigative Report: Remaining useful life of Fraser River Bridge (1975)
Item — Multiple Containers
Dates:
Inclusive Dates
Fraser River Bridge, New Westminster (1976, Mile 118.7, Yale Subdivision): Remediate damage caused by barge accident
Item — Multiple Containers
Dates:
Inclusive Dates
News Articles: Newspaper clippings of barge accident
Item — Multiple Containers
Dates:
Inclusive Dates
Damage Analysis: Report on estimated fatigue damage of Fraser River Bridge (1976, Fisher)
Item — Multiple Containers
Dates:
Inclusive Dates
Investigation of estimated fatigue damage (1979, CN Rail)
Item — Multiple Containers
Dates:
Inclusive Dates
Fraser River Bridge, New Westminster (1991): In-depth inspection and evaluation report (Draft copy produced by Modjeski and Masters)
Item — Multiple Containers
Dates:
Inclusive Dates
Cisco Railway Bridge (1977, Mile 103.7, Ashcroft Subdivision): Aim to restore bridge after fire
Item — Multiple Containers
Dates:
Inclusive Dates
Personal Notes: Contain telephone conversations with R. Sweeney as well as rough calculations (References Basic Column Strength by ASCE)
Item — Multiple Containers
Dates:
Inclusive Dates
Technical Drawings: Depict damaged sections, includes structural and member analysis
Item — Multiple Containers
Dates:
Inclusive Dates
Ottawa River Bridge (1980, Mile 21.4, Kingston Subdivision): In-depth fatigue damage assessment (Vol. I, CNR)
Item — Multiple Containers
Dates:
Inclusive Dates