Item 1.1
Container
Contains 57 Results:
Interim Guideline No. 1: Steel Moment Frame Connection (FINAL DRAFT)
Item — Multiple Containers
Dates:
Inclusive Dates
Williamsburg Bridge Technical Advisory Committee: Technical Report to the Commissioners of Transportation of the City and State of New York (June 30, 1988)
Item — Multiple Containers
Dates:
Inclusive Dates
Fraser River Bridge, New Westminster (1975, Mile 118.7, Yale Subdivision): Aim to replace deteriorating timber trestle (with steel equivalent)
Item — Multiple Containers
Dates:
Inclusive Dates
Building Performance Study: Focuses on the impact of fire damage to the structural stability of WTC buildings
Item — Multiple Containers
Dates:
Inclusive Dates