Item 1.2
Container
Contains 40 Results:
Design Concept Williamsburg Bridge (Cable Stayed Bridge): DCR Consultants, Inc.
Item — Multiple Containers
Dates:
Inclusive Dates
Reference Material: Includes Trailing Edge-to-Aft Shear Fitting Joint, General Dynamics Torque-Tension Relationships on Bolts, Strainsert Bolt Data, Failures of Mechanical Fasteners, HSS Trusses with Welded Connections, Extrapolation of Fatigue Test Data to Damage in Structures, and Symposium on Tubular Structures
Item — Multiple Containers
Dates:
Inclusive Dates
Review of Expert Witness Report by Dr. Remke (Aug. 2005)
Item — Multiple Containers
Dates:
Inclusive Dates
Mediation Statement on Behalf of Hardesty and Hanover, LLP
Item — Multiple Containers
Dates:
Inclusive Dates
Westgate Bridge: Melbourne (1990): Early fatigue cracking detected
Item — Multiple Containers
Dates:
Inclusive Dates
Proposal to the National Science Foundation: For consideration for an engineering research centers program
Item — Multiple Containers
Dates:
Inclusive Dates