Item 1.2
Container
Contains 40 Results:
Fraser River Bridge, New Westminster (1976, Mile 118.7, Yale Subdivision): Remediate damage caused by barge accident
Item — Multiple Containers
Dates:
Inclusive Dates
Final Draft-World Trade Center Building Performance Study: Data Collection, Preliminary Observations, and Recommendations
Item — Multiple Containers
Dates:
Inclusive Dates
Gettler and Ruffing vs Paxton-Mitchell: Report of Expert Pursuant to Federal Rules of Civil Procedure
Item — Multiple Containers
Dates:
Inclusive Dates
Reference Material: Machine Design: New Data on Fastener Fatigue, and General Electric Technical Notes:Program Description
Item — Multiple Containers
Dates:
Inclusive Dates
The 1999 FHWA Steel Bridge Fabrication Scanning Tour
Item — Multiple Containers
Dates:
Inclusive Dates
High Strength Bolts (1992): AISC Task Committee 110 (TC110)
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Detailed conversation between ATLASS and Bechtel Corporation about design revisions
Item — Multiple Containers
Dates:
Inclusive Dates