Box 2
Container
Contains 6 Results:
Cisco Railway Bridge (1977, Mile 103.7, Ashcroft Subdivision): Aim to restore bridge after fire
Item — Multiple Containers
Dates:
Inclusive Dates
Personal Notes: Contain telephone conversations with R. Sweeney as well as rough calculations (References Basic Column Strength by ASCE)
Item — Multiple Containers
Dates:
Inclusive Dates
Technical Drawings: Depict damaged sections, includes structural and member analysis
Item — Multiple Containers
Dates:
Inclusive Dates
Ottawa River Bridge (1980, Mile 21.4, Kingston Subdivision): In-depth fatigue damage assessment (Vol. I, CNR)
Item — Multiple Containers
Dates:
Inclusive Dates
Assiniboine River Bridge (1980, Mile 50.4, Rivers Subdivision): In-depth fatigue damage assessment (Vol. I II, CNR)
Item — Multiple Containers
Dates:
Inclusive Dates
Quebec Cartier Mining Bridge (1978, CANAC Consultants Ltd.): Assessment of carrying capacity and useful life
File — Multiple Containers
Dates:
Inclusive Dates