Item 1.5
Container
Contains 25 Results:
Proposed Replacement for the Williamsburg Bridge (Cable Stayed Bridge): Skidmore, Owings Merrill
Item — Multiple Containers
Dates:
Inclusive Dates
Assessment of Fatigue Resistance of the Grid Decks for the Hackensack and Passaic River Bridges
Item — Multiple Containers
Dates:
Inclusive Dates
Report on Assessment of Stress Relief Procedures in Westgate Bridge Cantilever Section
Item — Multiple Containers
Dates:
Inclusive Dates
Reports on Design Review and Finite Element Analysis
Item — Multiple Containers
Dates:
Inclusive Dates
Report: Safety Considerations, Static Behavior of Load Cells, and Dynamic Behavior of Load Cells
Item — Multiple Containers
Dates:
Inclusive Dates
Second Annual Report to National Science Foundation, Vol. 1: Strategic Plans and Research Accomplishments
Item — Multiple Containers
Dates:
Inclusive Dates
N.J. DOT Rating: Design of ASTM A 36 Steel, notes and rating summary
Item — Multiple Containers
Dates:
Inclusive Dates