Box 3
Container
Contains 27 Results:
Ontario Hydro (1980): Determination of connection type/size for intake structure
File — Multiple Containers
Dates:
Inclusive Dates
Technical Drawings: Details of intake structure girder and floatation ring
Item — Multiple Containers
Dates:
Inclusive Dates
Written Correspondence: Ontario Hydro seeks guidance in the analysis of connection types from Fisher and M. Tse
Item — Multiple Containers
Dates:
Inclusive Dates
Caltrans Light Pole Test (1981): Test study conducted on connection mechanisms
File — Multiple Containers
Dates:
Inclusive Dates
Test Setup: Technical drawings detailing test setup specifications
Item — Multiple Containers
Dates:
Inclusive Dates
Static Load Tests: Computed strain and deflection values for each specimen
Item — Multiple Containers
Dates:
Inclusive Dates
Load Displacement and Summary: Load/strain graphs, includes chart detailing conclusions
Item — Multiple Containers
Dates:
Inclusive Dates
Photographs: Black and white photos with description (35 count)
Item — Multiple Containers
Dates:
Inclusive Dates
Bechtel Tests (1978-1980, Callaway Site): Various tests conducted plates and connections
File — Multiple Containers
Dates:
Inclusive Dates