Folder 4
Container
Contains 149 Results:
42 CTA Sideframe Drawings: Comments, suggestions and questions
Item — Multiple Containers
Dates:
Inclusive Dates
Light Rail Welded Truck: A710 Stress Relief Cracking Tests
Item — Multiple Containers
Dates:
Inclusive Dates
General Comments on Drawing Notes and One-Sided Welds: Suggestions
Item — Multiple Containers
Dates:
Inclusive Dates
Test Verification of Drywell Floor Steel Connections
Item — Multiple Containers
Dates:
Inclusive Dates
Sequoyah Nuclear Plant Test Verification Weak Axis Shear and Torsion on Platform Steel Connections
Item — Multiple Containers
Dates:
Inclusive Dates
Drywell Platforms and Miscellaneous Steel Corrective Action Plan
Item — Multiple Containers
Dates:
Inclusive Dates
Welded and Bolted Clip Angle Evaluation Methodology
Item — Multiple Containers
Dates:
Inclusive Dates