Item 4.1
Container
Contains 28 Results:
Notes and Correspondence: Includes report drafts as well as cost estimates
Item — Multiple Containers
Dates:
Inclusive Dates
Outline of Swampy Report: Includes test results, plots and analysis
Item — Multiple Containers
Dates:
Inclusive Dates
Test Verification of Drywell Floor Steel Connections
Item — Multiple Containers
Dates:
Inclusive Dates
Cover-Plated Beams - Unwelded and Welded Ends (300-390)
Item — Multiple Containers
Dates:
Inclusive Dates
Fort Duquesne Bridge and Monongahela River Bridge Slides
Item — Multiple Containers
Dates:
Inclusive Dates