Folder 5
Container
Contains 151 Results:
Instrumentation and Testing of the Wabasha Street Bridge (1988)
Item — Multiple Containers
Dates:
Inclusive Dates
Notes: Includes some correspondence as well as sample calculations and preliminary analysis
Item — Multiple Containers
Dates:
Inclusive Dates
CTA Rail Fractures: Fracture Examination and Analysis
Item — Multiple Containers
Dates:
Inclusive Dates
Photographs: Photos of the interior of the field house including connections
Item — Multiple Containers
Dates:
Inclusive Dates
Notes: Includes personal notes and calculations as well as test result reports
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Includes some personal notes, emails and reference material
Item — Multiple Containers
Dates:
Inclusive Dates
Fatigue-Resistant Design of Cantilevered Signal, Sign, and Light Supports
Item — Multiple Containers
Dates:
Inclusive Dates