Item 6.1
Container
Contains 21 Results:
Request for Proposals: Design, Manufacture, Erection and Test of 10 Radio Telescope Antennas
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Includes photos and background information
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Includes project plan, email conversation and some personal notes
Item — Multiple Containers
Dates:
Inclusive Dates
Fatigue Design and Testing of Modular Bridge Expansion Joint: Executive Summary
Item — Multiple Containers
Dates:
Inclusive Dates
Technical Drawings: Detailed schematics on tested structure
Item — Multiple Containers
Dates:
Inclusive Dates
Technical Drawings: Details of intake structure girder and floatation ring
Item — Multiple Containers
Dates:
Inclusive Dates
Brunswick Nuclear Plant: Phase I Engineering Walkdown Procedure for Reactor Building Supplementary Steel
Item — Multiple Containers
Dates:
Inclusive Dates
Distribution of Engineering Walkdown Procedure (WDP)
Item — Multiple Containers
Dates:
Inclusive Dates
Notes and Correspondence: Includes preliminary analysis and calculations
Item — Multiple Containers
Dates:
Inclusive Dates
Report: Fatigue Strength of Weathered and Deteriorated Riveted Members
Item — Multiple Containers
Dates:
Inclusive Dates