Item 6.2
Container
Contains 11 Results:
Report: Inspection and Condition Report of Passenger Transfer System at Tampa International Airport
Item — Multiple Containers
Dates:
Inclusive Dates
Slides of metal and weld samples before and after testing showing cracking and weld features
Item — Multiple Containers
Dates:
Inclusive Dates
Technical Drawings: Structure details as well as location plan
Item — Multiple Containers
Dates:
Inclusive Dates
Fatigue Criteria for Modular Bridge Expansion Joints
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Includes personal notes, exchanged conversation as well as preliminary reports
Item — Multiple Containers
Dates:
Inclusive Dates
Written Correspondence: Ontario Hydro seeks guidance in the analysis of connection types from Fisher and M. Tse
Item — Multiple Containers
Dates:
Inclusive Dates
Brunswick Steel Electric Plant: Phase II Walkdown Procedure
Item — Multiple Containers
Dates:
Inclusive Dates
Strain Gage tests on the French Broad Ivy Bridge, Milepost S-161.2
Item — Multiple Containers
Dates:
Inclusive Dates