Box 4
Container
Contains 20 Results:
Final Draft: Notes from the Nov. 1992 meeting, includes final specification changes
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Details of specification changes related to block shear, includes some personal notes and calculations
Item — Multiple Containers
Dates:
Inclusive Dates
Report on Bearing Strength of Bolted Connections (P.C. Birkemoe): Includes draft
Item — Multiple Containers
Dates:
Inclusive Dates
Connections (1978): Changes in shear lag specifications for welded connections (TC108)
Item — Multiple Containers
Dates:
Inclusive Dates
Connections (LRFD Spec.) (1981): Changes in LRFD specifications
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence (1980): Finalized specification changes
Item — Multiple Containers
Dates:
Inclusive Dates
Correspondence (1981): Detailed conversation between the Committee on Building Specifications discussing LRFD changes
Item — Multiple Containers
Dates:
Inclusive Dates
Progress Report (1975): Tentative Load and Resistance Factor Design Criteria for Connections (T.V. Galambos and M.K. Ravindra) (2 count)
Item — Multiple Containers
Dates:
Inclusive Dates