Item 1.7
Container
Contains 18 Results:
Design Concept for the Replacement of the Williamsburg Bridge (Cable Stayed Bridge): Acer Freeman Fox Ltd. in association with Morrison-Knudsen Engineers, Inc.
Item — Multiple Containers
Dates:
Inclusive Dates
Materials for Response to AMOG and TWI (2005): Confidential communication finalizing reports
Item — Multiple Containers
Dates:
Inclusive Dates
Report on Field Testing of Steel Open-Grid Roadway Deck
Item — Multiple Containers
Dates:
Inclusive Dates
Third - Year Progress Report and Renewal Proposal to National Science Foundation, Vol. 1: Programs, Plans and Projects
Item — Multiple Containers
Dates:
Inclusive Dates
History of Loading and Stresses, Live Load Summary, Fatigue Life of Stiffening Truss, Cause of Main Tower Overstress, Study of Catastrophic Failure Scenarios During Load Transfer for Recabling, and Overstressed Stringers on the Manhattan Approach
Item — Multiple Containers
Dates:
Inclusive Dates
PATH Radiographic Inspection of Pa. Trucks and Bolsters
Item — Multiple Containers
Dates:
Inclusive Dates