Box 11
Container
Contains 23 Results:
Degenkolb (1991): Kaiser Oakland weld evaluation, includes analysis, schematics, calculations and recommended repair
File — Multiple Containers
Dates:
Inclusive Dates
Dessau-Beauharnois Bridge (1990): Loose bolt connections on small suspension bridge
File — Multiple Containers
Dates:
Inclusive Dates
Bethlehem Corp. Railroad Turntable (1992, HNTB): Consulted on constructibility, weldability, and expected lifespan of the structure
File — Multiple Containers
Dates:
Inclusive Dates
Wabasha Street Bridge, St. Paul (1989, Sverdrup Corp.): Fatigue analysis of segmented truss span
File — Multiple Containers
Dates:
Inclusive Dates
Correspondence: Includes analysis results, calculations, and some photos
Item — Multiple Containers
Dates:
Inclusive Dates
Instrumentation and Testing of the Wabasha Street Bridge (1988)
Item — Multiple Containers
Dates:
Inclusive Dates