Folder 18
Container
Contains 55 Results:
Proposals and Procedures: Proposal for Field Inspection, Instrumentation, Controlled Load Testing and Monitoring, Project Specific Quality Management Plan
Item — Multiple Containers
Dates:
Inclusive Dates
Birmingham Bridge Crack Details: Includes photos and schematics
Item — Multiple Containers
Dates:
Inclusive Dates
Summary of Inspection of Floorbeam Fatigue Cracks for Field View
Item — Multiple Containers
Dates:
Inclusive Dates
Results of Field Monitoring Prototype Floorbeam Connection Retrofit Details on the Birmingham Bridge: PDF Available at ; HYPERLINK "http://preserve.lehigh.edu/engr-civil-environmental-atlss-reports/42/" \h ;http://preserve.lehigh.edu/engr-civil-environmental-atlss-reports/42/
Item — Multiple Containers
Dates:
Inclusive Dates
Report on Field Inspection, Assessment, and Analysis of Floorbeam Connection Cracking on the Birmingham Bridge, Pittsburgh PA: PDF Available at ; HYPERLINK "http://preserve.lehigh.edu/engr-civil-environmental-atlss-reports/24/" \h ;http://preserve.lehigh.edu/engr-civil-environmental-atlss-reports/24/
Item — Multiple Containers
Dates:
Inclusive Dates
Report: Core Sample Examination (includes photos of samples)
Item — Multiple Containers
Dates:
Inclusive Dates