Box 18
Container
Contains 37 Results:
Heat Cambering (1996-1997, Little Steel): Assessment of heat cambering procedure for girders
File — Multiple Containers
Dates:
Inclusive Dates
Puerto Rico Wharf Tie Back (2001): Progressive wharf failure
File — Multiple Containers
Dates:
Inclusive Dates
Missouri River Bridge (2002-2003, Fort Pierre, SD): Weld cracking investigation
File — Multiple Containers
Dates:
Inclusive Dates
Work Plan for Weld Inspection and Repair (South Dakota DOT)
Item — Multiple Containers
Dates:
Inclusive Dates
Deer Island Bridge Cables (2003): Cable testing (ATLASS)
File — Multiple Containers
Dates:
Inclusive Dates
Kiln Tire Failure (2001-2002, WJE): Fracture examination of tire cracking
File — Multiple Containers
Dates:
Inclusive Dates