May 15 - May 29, 1962

 File — Box: 0334.02, Folder: 12, Item: 12

Scope and Contents

May 15 Bartholomew to Carr re: Change Orders - Rock Excavation costs, Sinkhole Repairs, Additional Tread & Risers Concrete Steps, Hasps & Locks, Bulkhead Doors, weatherstripping exterior doors, tumbler - toothbrush holders, mail slots, Construction & location Catch Basin & Manhole May 16 (see previous) re: latest Periodical Estimates for Altemus, Inc. and West Side Electrical Services May 16 (see previous) re: Construction Report No. 24 May 18 Bartholomew to Morris Black & Sons, Inc. re: contract for furnishing folding fabric doors to the Robert Pfeifle Homes May 18 Bartholomew to Carr re: weekly Construction Report Nos. 355 - 361 May 23 Bartholomew to Brown re: proposed new Boiler - Boiler House Extension, demolition of existing meter house May 24 Bartholomew to Carr re: Final Inspection and Memorandum for Occupancy, (list of) inspectors May 25 (see previous) re: daily Construction Reports Nos. 362 - 368 May 28 Bartholomew to Brown re: requirement of border fencing along Dover Lane May 28 Frank A. Scattene to Ralph Bartholomew re: damage to underground main gas supply pipe installed by Scattene by Lehigh Valley Pipe Fabricating - heating contractors May 29 Bartholomew to Brown re: liability insurance coverage for Lehigh Valley Pipe Fab. Co. contractor

Dates

  • Creation: 1962

Creator

Language of Materials

From the Collection:

English

Language of Materials

From the Collection:

English

Access Restrictions

Access Restrictions: Collection housed remotely. Users need to contact 24 hours in advance.

Extent

From the Collection: 6.5 Linear Feet (3 boxes, 3 flat folders)

Repository Details

Part of the Lehigh University Special Collections Repository

Contact:
Lehigh University
Linderman Library
30 Library Drive
Bethlehem PA 18045 USA
610-758-4506
610-758-6091 (Fax)